February 2, 2014
|
|
|
|
OSI Allegro Surgical Table
We completed a PM on an Allegro surgical table. After completing a visual inspection, we were unable to get a ground resistance on the table. We disconnected the power cord and checked the ground resistance. It was high so we took the plug apart and the ground wire was loose on the plug. The hot wire pulled out also. I rewired the plug and connected it back to the table and was able to get a ground resistance within specifications.
|
OSI Modular Table System Axis Jackson
The Axis Jackson table was out of calibration by -4 percent. I consulted the user manual to complete the hinged frame. Upon following the steps in the manual, the table was calibrated to an accurate home position.
Various other tasks completed for the afternoon include...
performing electrical safety inspections and PM's on 2 Aida's, restoring and deleting patient files on an Aida, PM and electrical safety on Storz Xenon, electrical safety and visual inspection on a MP SBC Computer and completed a visual inspection cleaned and located some of the equipment that are listed as PAR on the PM schedule.